VMware migration, without the guesswork

Move virtual workloads from VMware to VirtuWa through a seven-stage program built around discovery, validation and rollback — so migration is a planned engineering exercise, not a leap.

Why teams move

What is driving VMware migration decisions

Most migration programs start with commercial pressure and end up being about control: licensing exposure, packaging changes, single-vendor dependency, and the desire to operate infrastructure on open, portable foundations.

Licensing exposure

Renewal and bundling changes have made multi-year cost forecasting harder.

Vendor lock-in

Proprietary formats and tooling limit portability and negotiating position.

Data residency

Regulatory expectations around where workloads and data physically run.

Support responsiveness

Time-zone and language gaps slow down critical incident handling.

Operational control

Teams want direct control of the platform they are accountable for.

Open foundations

Preference for Linux, KVM, QEMU, libvirt and standard APIs.

The journey

A seven-stage migration program

Each stage has entry criteria, validation evidence and a defined rollback path.

  1. 1

    Discovery

    Inventory clusters, hosts, VMs, storage, networks, dependencies and licensing exposure.

  2. 2

    Assessment

    Score every workload for migration complexity, downtime tolerance and target sizing.

  3. 3

    Design

    Design the target ASAS HV / Lejam environment: clusters, storage, networking, RBAC and protection.

  4. 4

    Pilot

    Migrate a representative non-critical wave and validate performance, tooling and operations.

  5. 5

    Migration waves

    Convert and move workloads in planned waves with rollback defined for each wave.

  6. 6

    Cutover

    Rehearsed cutover windows with validation checklists and documented fallback.

  7. 7

    Operate & optimize

    Hand over to steady-state operations with monitoring, backup policies and automation in place.

Scope

What gets migrated, and how

Workloads and data

  • Virtual machine compute, memory and disk configuration
  • Virtual disk conversion to KVM-compatible formats
  • Guest OS boot and driver validation
  • Application-level validation before decommissioning the source

Platform and operations

  • Network topology, VLANs and segmentation mapping
  • Storage layout, performance profiles and capacity planning
  • RBAC model, audit logging and operational runbooks
  • Backup policies and disaster recovery plans on the target
Side by side

Source and target at a glance

AreaVMware sourceVirtuWa target
HypervisorESXiASAS HV (KVM/QEMU)
ManagementvCenter and add-on modulesLejam Cloud Manager
Migration toolingVendor and partner toolingJisir Migration
ProtectionAdd-ons or third-party productsHemaya Backup & DR
AutomationPowerCLI, vendor APIsREST API and Terraform provider via Mehad
Operating languageEnglishArabic and English
Support modelGlobal support organisationRegional engineering and support

Start with an assessment, not a commitment

We will inventory your environment, score the workloads and return a phased migration plan with effort and risk per wave.

FAQ

VMware migration questions

Timelines depend on workload count, dependency complexity and change windows. A discovery and assessment typically takes two to four weeks, after which migration waves are scheduled against your maintenance calendar.